1.3.1 Introduction
The
programme of Panchayat Union School Renovation introduced in 2007-08
envisages repair and improvement of all Panchayat Union Elementary
Schools and Middle Schools in the State in a phased manner. There are
around 22,000 Panchayat Union Primary Schools and 4,500 Panchayat Union
Middle Schools which are being maintained by Block Panchayats. Due to
lack of proper maintenance, most of these School buildings have become
dilapidated. Hence, the repair and renovation of such long neglected
school
buildings were taken up under this
new scheme which was sanctioned vide G.O. Ms. No. 94, Rural
Development and Panchayat Raj (SGS4) Department, dt. 12.06.2007.
The
detailed guidelines have been issued along with the same Government
order. The amendment to guidelines were issued vide Secretary to Government. RD&PR
(SGS-1) Dept. Lr.No.40010/SGS-1/07-1 dt. 13.12.2007.
Updated guidelines for implementation of the scheme for 2008 - 09 have been issued vide G.O.(Ms) No. 97 RD&PR (SGS.1) Dept. dt. 06.06.2008.
1.3.2 Brief Guidelines
As per the guidelines, a selection committee
consisting of the
following members is given the responsibilities for the finalization of
the repair works to be carried out in each of the school buildings:
- Block Development Officer (Block Panchayat)–Convener of
the
Committee
- Union Engineer
- Assistant Elementary Education Officer (AEEO) concerned
- Head Master of the Panchayat Union School
- Village Panchayat President
- Panchayat Union Ward Member Concerned.
In identification by the Committee of the repair works to be carried out, the following order of priority has to be strictly observed:
- Priority Works:
- White washing / Colour washing of the buildings
(except those buildings, where white washing / colour washing was done within the last 3 years).
- Under taking repairs of RCC roof (in terms of
putting up
weathering
course or taking up
leak proofing etc.)
- Repairs / replacement of damaged flooring
- Painting of Black Boards
- Repair/ replacement of doors and windows
- Minor repairs of damaged tiles/rafters/ reapers in
buildings with tiled
roofing.
- Repairs of cracks in buildings walls.
- Special Works: e.g.
Replacement of tiled roofing
or
Asbestos sheet
roofing by Mangalore tiles
In respect of such works where replacement of tiled roofing or Asbestos sheet roofing is to be taken up as suggested by the Committee, The Assistant Executive Engineer (RD) concerned has to inspect each and every work and verify the type of work which
can be undertaken on site considering the building condition and also the cost involved for that purpose. Such cases are to
be dealt with on a case to case basis separately and are to be approved by the District Collectors also separately. Totally dillapidated buildings requiring replacement are not to be taken for repair.
The works are executed through tendering process. The Block Development Officer (Block Panchayat) is designated as the tender inviting authority. |
1.3.3 Works
In the year 2007-08, an allocation of Rs. 135 crores have been made for renovation of 10,248 School buildings in AGAMT Village
Panchayats of both AGAMT
2006-07 and 2007-08 Villages.
After inspection by selection committee and engineers, 10150 school buildings have actually been taken up for renovation and repair at an estimated cost of Rs. 102.59 crores in the year 2007-08. The district-wise breakup is given in the Table 1.3.1 and breakup of components of repair is given in the Table 1.3.2:
Table 1.3.1
Panchyat Union School Renovation Program, 2007-08
District-wise works taken up details
Sl.No. |
Name of the District |
No of the School buildings taken up for renovation |
Financial Allocation (Rs.in crores) |
1 |
Kancheepuram |
279 |
5.13 |
2 |
Tiruvallore |
345 |
4.53 |
3 |
Cuddalore |
332 |
4.45 |
4 |
Villupuram |
738 |
7.48 |
5 |
Vellore |
503 |
5.60 |
6 |
Tiruvannamalai |
505 |
7.03 |
7 |
Salem |
877 |
6.26 |
8 |
Namakkal |
248 |
5.05 |
9 |
Dharmapuri |
414 |
4.26 |
10 |
Krishnagiri |
483 |
4.14 |
11 |
Erode |
391 |
5.31 |
12 |
Coimbatore |
383 |
1.62 |
13 |
The Nilgiris |
117 |
1.33 |
14 |
Thanjavur |
350 |
2.68 |
15 |
Nagapattinam |
195 |
1.78 |
16 |
Thiruvarur |
263 |
2.42 |
17 |
Trichy |
589 |
4.33 |
18 |
Karur |
250 |
1.72 |
19 |
Perambalur |
239 |
2.63 |
20 |
Pudukottai |
570 |
5.32 |
21 |
Madurai |
276 |
3.38 |
22 |
Theni |
79 |
1.53 |
23 |
Dindigul |
355 |
3.56 |
24 |
Ramnathapuram |
346 |
2.48 |
25 |
Virudhunagar |
232 |
2.29 |
26 |
Sivagangai |
362 |
3.30 |
27 |
Tirunelveli |
211 |
1.55 |
28 |
Tuticorin |
171 |
0.90 |
29 |
Kanyakumari |
47 |
0.53 |
Grand Total |
10150 |
102.59 |
Table 1.3.2
Components of repair in Panchyat
Union School Renovation Program in 2007-08
Sl No |
Components |
Taken up |
Amount required (Rs.in crores) |
1 |
White /Colour washing of buildings |
15784 |
20.62 |
2 |
Undertaking repairs of RCC roofing of builidngs |
5769 |
11.79 |
3 |
Repair /Replacement of Damaged flooring of buildings |
7056 |
4.52 |
4 |
Painting of Black Boards of buildings |
14654 |
2.78 |
5 |
Repair/Replacement of Doors and Windows |
9970 |
5.44 |
6 |
Minor Repairs of damaged tiles/rafters/reapers |
2765 |
2.54 |
7 |
Repair of cracks in building walls |
5160 |
1.83 |
8 |
Other works of buildings |
13136 |
8.61 |
9 |
Complete replacement of tiled roofing of buildings |
677 |
5.13 |
10 |
Conversion of Asbestos roofing in to Mangaloe tiled roofing of buildings |
3730 |
39.33 |
| Total |
102.59 |
During
the year 2008-09 around 5000
Elementary and Middle School
buildings in AGAMT 2008-09 villages are being taken up for repairs and
improvement and Rs. 60 crores has been allocated to carry out works
under this scheme.
The Panchayat Union Elementary and Middle Schools originally located in Village Panchayats which have subsequently been upgraded as Town Panchayats and Third Grade Municipalities are still the assets of the respective Panchayat Unions. Hence, during 2008-09, 467 Panchayat Union Elementary and Middle Schools located in Town Panchayats and Third Grade Municipalities are being taken up for repair and renovation as per G.O.Ms.No.139 RD & PR (SGS.1) Department, dated, 28.08.2008. at an estimated cost of Rs. 11.69 crores.
|