Externally Funded Schemes : Emergency Tsunami Reconstruction Project – Vulnerability Reduction of Coastal Communities Project (ETRP - VRCCP)
funded by World Bank (WB)

3.3 Emergency Tsunami Reconstruction Project (ETRP) funded by World Bank (WB)

This project was originally started in 2005 with the loan assistance of the World Bank (G.O.(Ms.) No.384, Revenue NC.4 (1) Department, Dated 01.07.2005).  This project is a component of the programme of recovery and reconstruction implemented by the State Government to mitigate the impact of the Tsunami.  The project was originally expected to be completed by October, 2007.

The objective of the project is to assist the borrower and the Project state to
  • Revive livelihood.

  • Promote recovery in the Tsunami affected areas in the short term.

  • To reduce the vulnerability of coastal communities to a range of natural hazards such as cyclone, storm surge, flood and tsunami over the long – term.

    The project comprises of the following parts

    • Part A             :           Housing Reconstruction.

    • Part B             :           Restoration of livelihood.

    • Part C             :           Public Building and public works.

    • Part D             :           Technical Assistance and Training.

    • Part E              :           Implementation support.

    • Part F              :           Vulnerability Reduction of Coastal Communities.

    Vulnerability Reduction of Coastal communities (ETRP – VRCC)

    • Rural Development and Panchayat Raj Department Implements the Reconstruction of Vulnerable Houses in 11 Coastal Districts of  Tamil Nadu.

    • Under the component of Reconstruction of Vulnerable Houses 17,000 risk – prone houses in the 200 – 1000 meter vicinity (except houses located in areas classified as CRZ-1)  of the HTL were envisaged

    Salient Features of ETRP – VRCC Project

    • The Project is funded by the World Bank.

    • Outlay of the project – Rs.669.28 crores (GO Ms.No.475, Revenue (NC – IV-1) Department dated 15.12.2009.

    • Project is upto 31.12.2011.

    • The Project is implemented in 11 Coastal Districts.

    • Reconstruction of vulnerable houses between 200m – 1000m from High Tide Line (HTL) in 444 Coastal Habitations.

    • Total plinth area of each house is 325 sq.ft.

    • Cost per House (Average tender value) Rs.3.79 lakhs.

    • 15,056 houses were identified and tendered in 157 packages in two phases involving 70 contractors (Phase – I 61 Packages 5,619 houses, Phase – II 96 Packages 9,437 houses).

    • 11 NGO appointed as third party facilitators for revalidation of beneficiaries, awareness generation and training.

    • Third party Quality Monitoring is being done by M/s. Mukesh Associates, Chennai.

    • The new houses are constructed insitu.

    • Shifting allowance of Rs.1000/- is paid as one time lump sum to each beneficiary.

    • During reconstruction period, Rs.500 is paid as rent allowance for a maximum of period of 18 months.

    • Houses reconstructed are insured against 14 types of disaster.

    Types of Vulnerable houses taken up for reconstruction under   ETRP – VRCC

    • Fully thatched houses.

    • Houses with thatched roof with any kind of wall like mud, brick, etc.

    • Houses with mud walls with any kind of roof structure.

    • Houses with brick walls and mud mortar with any kind of roof structure.

    • Houses built with Government funds prior to 1.1.1996 under IAY, Fishermen housing scheme, etc.,

    Eligibility Criteria

    The Eligibility Criteria is defined in the housing Policy GO Ms.No.774 Revenue (NC – IV-1) Dated 27.12.2007

    • Vulnerable houses located between 200 – 1000 meter from HTL.

    • Beneficiaries with clear title for the site.

    • Hazy title without any dispute.

    • NOC from the Institution – Church, Mosque, Temple, Mud, Chatram etc.

    • IAY, fishermen houses which are more than 10 years old as on 01.01.2006.

    Houses Design Options

    • Five different house design options were given to the beneficiaries to choose according to their taste and suitable to the site conditions.

    • Each house will have a plinth area of 325 sq.ft. which consists of a Hall, bed room, kitchen and toilet with a provision of staircase to terrace.

    • The beneficiary can make slight alterations in the plan without jeopardizing the basic plan and area.

              A grievance redressal mechanism has also been established at the district and village levels.  The District Level Monitoring Committee is headed by the District Collector with the members including Project Co-ordinator, District Implementation Unit, DRO (R&R), Tahsildar, EE, NGO, BDO, etc.  The Village level Grievance Redressal Committee is headed by the Village Panchayat President which includes the Vice President, VAO, Project Engineer, one women member and SC / ST member of the Panchayat and a NGO representative

               Due to protracted procedures adopted in the subsequent periods, this project commenced in December 2009 only with a project outlay of about Rs.670 crores and the project period has been fixed upto 31.12.2011.  The ETRP – VRCCP has two important components, namely reconstruction of vulnerable houses and provision of evacuation routes with signage.

    Stage of Houses

    Out of 15,056 houses identified 14,368 houses were found eligible and are in different stages of construction.

    The Progress of the reconstruction of the houses is as under.

Sl. No

Name of the District

No of Packages

No. of houses taken up

Agreement Value
(Rs. in crores)

Stage of houses Total Expenditure
(Rs. in crores)
Earth work FC Laid Grade beam level Basement Lintel Level Lintel Laid Roof Level Roof Laid Plastering Physically Completed Completed

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

1 Tiruvallur

1

86

3.22

0

0

0

0

0

0

0

0

0

0

86

3.01

2 Kancheepuram

7

638

22.03

0

0

0

0

0

0

0

0

0

0

638

22.53

3 Villupuram

18

1738

66.85

0

0

0

0

70

134

141

293

407

198

495

47.02

4 Cuddalore

4

336

11.96

6

0

0

0

7

16

1

62

123

121

0

9.43

5 Nagapatinam

23

2151

85.41

1

4

28

285

433

222

265

578

150

158

27

37.41

6 Thanjavur

8

782

30.31

0

0

0

40

73

81

98

127

34

95

234

17.79

7 Pudukottai

14

1247

46.13

0

31

22

210

177

96

111

203

110

192

95

22.62

8 Ramnad

56

5115

192.04

116

206

678

999

296

268

459

906

340

741

106

84.64

9 Thoothukudi

7

408

14.59

0

0

0

0

0

0

0

0

0

210

198

11.51

10 Thirunelveli

8

750

28.85

0

10

113

136

120

42

111

109

58

51

0

10.28

11 Kanniyakumari

11

1117

44.39

0

0

0

0

30

13

45

208

116

222

483

29.10

Total

157

14,368

570.08

1,068

1,064

2,159

3,582

1,433

1,394

1,307

1,033

875

1988

2362

295.33

ETRP VRCCP house  at Kuthankuzhi /Melur in Tirunelveli District

ETRP VRCCP house  at Kuthankuzhi /Melur  in Tirunelveli District

ETRP VRCCP house at Patthiranvayal in Ramanathapuram District

ETRP VRCCP house at Soliyakuti  in Ramanathapuram District

ETRP VRCCP House at Kilputhupattinam in Kanniyakumari District

ETRP VRCCP house at Kilputhupattinam in Kanniyakumari District

ETRP VRCCP house in Kanniyakumari District at Kilputhupattinam

Evacuation Routes

              Evacuation routes to improve road linkages to Evacuation Shelters (which are to be constructed by the PWD Department) with signages along the coastal areas to provide easy escape in times of emergencies has been taken up for 45 kilometers under this project at an estimate cost of Rs.25 crores.  Tenders have been floated and the last date for receipt of tenders is 06.01.2012.

Details Evacuation Routes & Signages

Sl.No

Name of the Districts

No of
Packages

No of  works

No of BT Road

No of CC Road

Length of BT  Road
(in km)

Length of CC Road
(in km)

Total Length of Road
(in km)

No of Bridges

No of Culvert

No of Drainages

No of Retaining Wall

Noof Signages

Total Value
 in Lakhs

Route Sign

Shelter Sign

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

1

Thiruvallur

2

5

Partly BT
Road

5

1.050

3.455

4.505

-

10

-

-

56

5

222.280

2 Kancheepuram 3 9 - 6 0.000 1.833 1.833 - 11

-

-

75

7 128.200

3

Villupuram

2

11

-

6

0.000

1.920

1.920

-

4

-

-

115

11

103.170

4

Cuddalore

5

39

-

27

0.000

8.988

8.988

-

9

-

-

239

28

433.450

5

Nagapattinam

3

9

-

9

0.000

2.740

2.740

-

5

-

6

30

3

232.160

6

Tiruvarur

2

14

-

12

0.000

5.141

5.141

-

4

-

-

139

31

252.580

7

Thanjavur

4

25

-

11

0.000

3.436

3.436

-

20

-

-

89

19

224.520

8

Pudukottai

6

19

-

10

0.000

4.014

4.014

-

7

-

-

120

12

233.020

9

Ramanathapuram

10

22

4

17

4.700

4.340

9.040

-

11

-

-

250

28

359.510

10

Thoothukudi

1

5

1

4

0.197

0.735

0.932

-

0

-

-

60

5

35.110

11

Thirunelveli

3

5

Partly BT
 Road

4

0.356

1.499

1.855

1

0

1

-

30

3

171.010

12

Kanniyakumari

1

4

-

4

0.000

1.007

1.007

-

0

-

-

40

4

37.380

Total

42

167

5

115

6.303

39.108

45.411

1

81

1

6

1243

156

2432.390

 

 
 

  Previous Top Next